Kamakana Centercourt
This was a project with the shopping center’s architects and Nordic construction. The system required massive posts and footings and we were able to tension 5/16″ cables about 70′. Each row of panels is strung together and tensioned in a line. Some of the fabric was printed. Since it faces down this will prolong the life of the inkl. The fabric is a porous Serge Ferrari soltis fabric. It is very stable and lets water through.